Why it matters
Ground resistance is one of the main acceptance tests in the commissioning of a PV plant, a substation or an energy storage system. It confirms that the grid installed in the field behaves as the design predicted, and it sets the baseline for future maintenance tests.
The test is simple to describe and easy to get wrong. Probe distance, probe position and the validation of the readings decide whether the number on the instrument means anything.
Key figures from the example
Example: a measurement taken at a PV plant in Brazil in October 2026.
What the document covers
- The three points of contact and the resistance-versus-distance curve
- Test planning: distances, soil and weather conditions, safety
- Field procedure, step by step
- Validating the plateau zone with three readings
- When the 62% method is not enough
- Common errors, a quick checklist and a blank test form
Who it is for
Commissioning engineers, design engineers and field technicians who perform and record the test.
Reference standards
IEEE Std 81, IEEE Std 80, IEEE Std 142, IEEE Std 2778, ANSI/NETA ATS and MTS, NFPA 70.