Why it matters
Grounding studies and protection studies are often prepared separately. The grounding design assumes a fault duration; the protection study later sets the real one. When the two do not match, a grid that was approved on paper can leave people exposed to unsafe touch voltages during a ground fault.
This paper splits the IEEE 80 touch-voltage criterion into two quantities with the same unit: the demand imposed by the fault and the protection, and the capacity of the grid with its surface layer. Both are drawn on the same 50N/51N coordination chart, so the mismatch is visible at a glance.
Key figures from the example
Example: an anonymized 2.5 MWac PV plant interconnected to a 34.5 kV utility feeder, with data adapted to U.S. practice.
What the document covers
- The method: protection demand versus grid capacity on one chart
- Fault scenarios at the POI switchgear, on both sides of the protection CTs
- Four mitigation options for discussion
- Common errors when grounding and protection are studied separately
- Minimum content of a compatibility check, with a study record template
- A companion spreadsheet that reproduces the calculation and the chart
Who it is for
Grounding, protection and interconnection engineers, and owner’s and independent engineers who review grounding and protection studies.
Reference standards
IEEE Std 80, IEEE Std 2778, IEEE Std C37.112, IEEE Std 367.