Solstice Energy← All resources
Technical paper · U.S. Market Edition

Weather-Corrected Performance Ratio of a Utility-Scale PV Plant

How to calculate a weather-corrected performance ratio from 15-minute SCADA data and compare it with the energy simulation and the guaranteed value.

Published November 13, 2026 · Vinicius Rafael Palaveri Leoni · 17 pages, PDF
Download the PDF

Why it matters

Performance ratio is the standard indicator of PV plant quality. Owners, lenders, independent engineers and EPC contractors use it at commissioning, at final completion and when checking performance guarantees.

A performance ratio measured over a short period depends on the weather of that period, especially module temperature. The weather-corrected value removes that dependence, so the result can be compared directly with the annual figure predicted by the energy simulation.

Key figures from the example

79.58%weather-corrected performance ratio
81.11%expected value from the simulation
78.68%guaranteed value (3% margin, assumed)
359accepted 15-minute intervals

Example: a 3,416 kWp DC / 2,500 kW AC plant in Brazil, evaluated over eight days in April 2025.

What the document covers

Who it is for

Performance engineers, commissioning engineers and asset managers who calculate, review or audit performance ratio results.

Reference standards

NREL weather-corrected performance ratio, ASTM E2848, IEC 61724 series, IEEE Std 1547, IEEE Std 2800.

Read the full document
Free to download. No sign-up required.
Download the PDF
Educational content. This document describes a method and illustrates it with an example. It is not an engineering study, design or recommendation for any specific project. Solstice Energy does not provide services that require professional engineering licensure in the United States. Site-specific studies must be prepared, signed and sealed by a licensed Professional Engineer.

Questions or comments on this document? Contact us.